Bachy Soletanche

 VINCI Construction, subsidiary Bachy Soletanche will build the foundations for a major building complex located in Hong Kong
PILING

Hong Kong real estate foundations contract for Bachy Soletanche

Proprietary rigs to be used by Bachy Soletanche in limited access piling job in Hong Kong

06 September 2022

The new Bauer eBG33 piling rig cuts 1,200kg of CO2 per day and reduces noise by 50%
PILING

HS2 trials 'first of a kind' electric drill rig

A Bauer Maschinen electric drill rig is being trialled as part of switch to zero-carbon construction

13 June 2022

 The Elizabeth line is a new railway route providing faster and more direct connections across London and beyond
INFRASTRUCTURE

Crossrail: Bachy Soletanche's contribution to the Elizabeth Line

An insight into the multiple piling jobs undertaken by Bachy Soletanche for the Elizabeth Line

26 May 2022

 Using a full range of solutions brought a range of benefits at a project by Taylor Woodrow where Bachy Soletanche and Vibro Menard delivered the geotechnical work contributing towards a target of achieving a 40 per cent reduction in direct CO2 emissions by 2030
PILING

Geotechnical collaboration drives down embodied carbon at EcoPark South

Multiple piling solutions used to keep carbon consumption as low as possible on UK site

07 April 2021

 Bachy Soletanche has retrofitted equipment to an older Bauer BG40 that allows it to meet the latest Stage V emissions restrictions
PILING

Bachy Soletanche reduces environmental impact of piling rigs

Retrofit work enables older drill rig to meet Stage V emissions standard

16 February 2021

 Since being profiled in the FPS video, Careers in Construction, five years ago Richard Lipscombe has gone on to establish his own geotechnical and structural instrumentation and monitoring business
VIEWPOINT

Youngsters in construction - Where are they now?

A look at how four youngsters' careers in the piling sector have progressed over five years

02 April 2020

 Bachy Soletanche has been awarded a £1.9m piling contract by GRAHAM, on the Congleton Link Road project
PILING

Link road geotechnical package for Bachy Soletanche

Piling contract awarded to Bachy Soletanche will see 400 piles used to support four bridges

15 July 2019

 Westpile has been merged with Bachy Soletanche
PILING

Westpile merges with Bachy Soletanche

Westpile has been merged with Bachy Soletanche to simplify its operating structure and efficiency

15 April 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.