economy

 Mine engineers at the underground ore transfer station at the Kakula Mine prior to it being made fully operational
MINING

Developing ahead of schedule

Once complete, the Kakula copper mine in the DRC will produce copper as environmentally as possible

03 June 2020

 Boart Longyear is at the forefront of core sample orientation technology
CORE SAMPLING

The past, present and future of core orientation

Boart Longyear's take on the past, present and future of core orientation

05 August 2019

 Balfour Beatty hired an NCB FD200 CFA / displacement piling rig from AGD Equipment when it needed to install 350mm displacement piles to 8m depth on a project in East London
PILING

Rental - the cost-saving alternative

How viable is rental as an alternative to purchasing expensive specialist drill rigs

06 March 2019

 A typical successfully drilled water well in Uganda
GROUNDWATER

Drilling under turnkey contracts in Uganda

On behalf of RWSN, Elisabeth Babb tells GDI about the popularity of turnkey contracts in Uganda

05 March 2019

 Mark Sheridan of the FPS
VIEWPOINT

The price of prompt payment

Are early payment schemes a good thing for the industry? Mark Sheridan of the FPS gives his opinion

16 January 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.