The breakthroughs are the latest milestones achieved along the two most important underground sections of the railway: the Valico Tunnel (Galleria di Valico) and the Serravalle Tunnel (Galleria dei
Webuild Group celebrated a double breakthrough for the Terzo Valico dei Giovi high-speed/high-capacity railway it is building between Genoa and Milan to improve the port’s links with the rail network in northern Italy and the rest of Europe.
The breakthroughs are the latest milestones achieved along the two most important underground sections of the railway: the Valico Tunnel (Galleria di Valico) and the Serravalle Tunnel (Galleria dei