Thanks to its innovative kinematics, the C6T XP-2 is suitable for all tunnelling drillings such as forepoling, upper and lower frontal drilling, rock bolts drilling of tunnel inverts as well as
date:18/09/2023
location:Perth
Meet the industry leaders who shape the Future of Mining in Australia
date:18/09/2023
location:Pan Pacific Perth
Meet the industry leaders who shape the Future of Mining in Australia
date:12/02/2024
location:8 Northumberland Avenue, London
Exceptional investment opportunities selected by Mining Journal
date:18/03/2024
location:Sydney Masonic Centre, Australia
Exceptional investment opportunities selected by Geodrilling International
The C6T XP-2 rig is the latest Casagrande tunnelling equipment engineered to satisfy the needs of the most demanding contractors with emphasis on performance, reliability and cost saving.
Thanks to its innovative kinematics, the C6T XP-2 is suitable for all tunnelling drillings such as forepoling, upper and lower frontal drilling, rock bolts drilling of tunnel inverts as well as
An in-depth look at the innovative Casagrande rigs working on an Italian power station project
Casagrande helps power plant go green
CZM introduces LR95 to its fleet
Gain Ground on the Competition
Simplify your geotechnical Jobs
Gain Ground on the Competition
Simplify your geotechnical Jobs