The Main-Danube-Canal (MDC) runs over a length of 171km in Bavaria and connects the Main and Danube rivers from Bamberg to Fürth and Nuremberg to Kelheim.
date:18/03/2024
location:Sydney Masonic Centre, Sydney, Australia
Exceptional investment opportunities selected by the MiningNews.net team
date:17/06/2024
location:Pan Pacific Perth
Exceptional investment opportunities selected by the MiningNews.net team
date:17/06/2024
location:Pan Pacific Perth
Mining Smarter. Mining Better.
date:01/07/2024
location:8 Northumberland Avenue, London
Exceptional investment opportunities selected by Mining Journal
When utility lines needed to be relocated under a canal from alongside a bridge which was due to be demolished, a GRUNDODRILL 28Nplus from Tracto proved to be up to job of drilling the extreme bore needed to carry them.
The Main-Danube-Canal (MDC) runs over a length of 171km in Bavaria and connects the Main and Danube rivers from Bamberg to Fürth and Nuremberg to Kelheim.
Granite shelf poses no problem for King of Rocks horizontal directional drill rig
Gain Ground on the Competition
Simplify your geotechnical Jobs
Gain Ground on the Competition
Simplify your geotechnical Jobs