The Main-Danube-Canal (MDC) runs over a length of 171km in Bavaria and connects the Main and Danube rivers from Bamberg to Fürth and Nuremberg to Kelheim.
date:28/03/2022
location:Sofitel Sydney Wentworth, Australia
Meet the industry leaders who shape the Future of Mining in Australia
date:26/09/2022
location:Denver, Colorado, USA
Meet the industry leaders who shape the Future of Mining in the Americas
date:18/09/2023
location:Perth
Meet the industry leaders who shape the Future of Mining in Australia
date:18/09/2023
location:Pan Pacific Perth
Meet the industry leaders who shape the Future of Mining in Australia
When utility lines needed to be relocated under a canal from alongside a bridge which was due to be demolished, a GRUNDODRILL 28Nplus from Tracto proved to be up to job of drilling the extreme bore needed to carry them.
The Main-Danube-Canal (MDC) runs over a length of 171km in Bavaria and connects the Main and Danube rivers from Bamberg to Fürth and Nuremberg to Kelheim.
Six culverts through rocky sub soil under a river requires a Grundodrill 18ACS rig from Tracto
Gain Ground on the Competition
Simplify your geotechnical Jobs
Gain Ground on the Competition
Simplify your geotechnical Jobs