The project is adjacent to the operational high-speed railway line, requiring construction equipment to not exceed 12m in height but with the capability to drill 800mm diameter piles to a depth of
date:18/03/2024
location:Sydney Masonic Centre, Sydney, Australia
Exceptional investment opportunities selected by the MiningNews.net team
date:17/06/2024
location:Pan Pacific Perth
Exceptional investment opportunities selected by the MiningNews.net team
date:17/06/2024
location:Pan Pacific Perth
Mining Smarter. Mining Better.
date:01/07/2024
location:8 Northumberland Avenue, London
Exceptional investment opportunities selected by Mining Journal
A Tysim KR300ES low headroom drilling rig has been operating in AnHui, an important part of YangTze River Delta, as part of the reinforcement project of No.142 bridge pier of Shanghai-ChengDu Line in LiuAn, AnHui, China.
The project is adjacent to the operational high-speed railway line, requiring construction equipment to not exceed 12m in height but with the capability to drill 800mm diameter piles to a depth of
Tyhen Foundation uses Tysim KR300ES rig to install piles in restricted access location
Gain Ground on the Competition
Simplify your geotechnical Jobs
Gain Ground on the Competition
Simplify your geotechnical Jobs