On the site close to Venice a Casagrande B275 XP-2 and B400 XP-2 have been used to construct approximately 2000 piles for over 50,000m in displacement piles with 620mm diameter and 25m maximum depth.
date:18/09/2023
location:Perth
Meet the industry leaders who shape the Future of Mining in Australia
date:18/09/2023
location:Pan Pacific Perth
Meet the industry leaders who shape the Future of Mining in Australia
date:12/02/2024
location:8 Northumberland Avenue, London
Exceptional investment opportunities selected by Mining Journal
date:18/03/2024
location:Sydney Masonic Centre, Australia
Exceptional investment opportunities selected by Geodrilling International
On the site of an old power plant in Italy, two Casagrande drilling rigs have made the foundations for a new integrated gasification combined cycle power plant.
On the site close to Venice a Casagrande B275 XP-2 and B400 XP-2 have been used to construct approximately 2000 piles for over 50,000m in displacement piles with 620mm diameter and 25m maximum depth.
An in-depth look at the innovative Casagrande rigs working on an Italian power station project
Gain Ground on the Competition
Simplify your geotechnical Jobs
Gain Ground on the Competition
Simplify your geotechnical Jobs