Bauer Maschinen

 The new BE 600-C desander is Bauer MAT Slurry Handling Systems’ successor to the established BE 550
INFRASTRUCTURE

"Next level" desanding with Bauer's BE 600-C

Two desanding plants within a single unit creates the unique BE 600-C package from Bauer

27 June 2023

 Bauer displayed a versatile multi-function BG 23 H drilling rig, including equipment for continuous flight auger drilling in the extended equipment configuration SPEX (Single Pass Extreme) at its recent in-house event
PILING

Bauer Maschinen Group's in-house exhibition returns

All of the highlights from Bauer Maschinen's recent in-house exhibition in Germany

30 May 2023

 Cementation Skanska and Bauer Maschinen (BMA) join forces to bring the world’s first plug-in, high-capacity drilling rig to work on the UK’s HS2 high-speed rail project
PILING

Cementation Skanska trials first use of plugged-in drilling rig

Cementation Skanska and Bauer bring the world's first plug-in drilling rig to work in UK

17 April 2023

 The Bauer Maschinen Group guests to an entirely redesigned and certified climate-neutral exhibition stand during bauma 2022
PILING

Bauer Maschinen Group at bauma 2022

After three years, it's a home coming for Bauer at Europe's biggest construction industry show

28 October 2022

 (left to right) Bavaria's Minister for Economic Affairs Hubert Aiwanger, Martin Sobczyk from TU Bergakademie Freiberg and Reinhard Quast, president of the Central Association of the German Construction Industry
SITE INVESTIGATION

'Deep Sea Sampling' research project gets bauma Innovation Award 2022

Deep sea mining project that includes Bauer takes top honours at bauma awards

25 October 2022

The new Bauer eBG33 piling rig cuts 1,200kg of CO2 per day and reduces noise by 50%
PILING

HS2 trials 'first of a kind' electric drill rig

A Bauer Maschinen electric drill rig is being trialled as part of switch to zero-carbon construction

13 June 2022

 Harms set up the BG 55, polymer slurry tanks, and all other necessary equipment and materials on custom-designed Flexifloat barges adjacent to the existing bridge
PILING

Installing 240ft drilled shafts with a barge-mounted Bauer drill rig

How to overcome the challenges of drilling deep, large diameter pile shafts from a barge on a river

03 June 2022

 ECA Canada currently supports Eastern Canada from its Ontario branch (pictured), but a new facility will be established in the Vancouver area with sales, parts, and service for all product lines to service its new Western Canada territory
PILING

ECA expands into Western Canada

Western Canada sales territory awarded to ECA by Bauer Maschinen and Bauer Equipment America

19 May 2022

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.