Bauer Spezialtiefbau GmbH

 The Bauer rig being used to drill the largest monopiles ever installed in India by Bauer Engineering India Private Limited
PILING

Bauer India installs large diameter piles for an Indian four-lane flyover

The largest monopiles ever installed in India by Bauer Engineering India

05 April 2023

 Bauer Spezialtiefbau together with BTR Bohrtechnik Roßwag was commissioned to undertaken the injection work to stabilise the harbour pier at Heligoland
INFRASTRUCTURE

Island injection work

Injection work by Bauer Spezialtiefbau stabilises the harbour pier at Heligoland

15 March 2023

 Specially designed Bauer Dive Drills are working in water depths of up to 40m and simultaneously drill holes up to 47m deep and 3m in diameter
PILING

Challenging offshore conditions are overcome by Bauer Spezialtiefbau piling team

Numerous challenges have been overcome by Bauer Spezialtiefbau during offshore piling work

23 January 2023

 The Bauer MC128 duty-cycle crane cutting a panel at the site of the Metro expansion in Chetpet, Chennai
INFRASTRUCTURE

Bauer's diaphragm wall works for Metro expansion in Indian metropolis

Indian Metro expansion facilitated by Bauer's creation of diaphragm walls

24 November 2022

 A joint venture between Bauer Resources and Bauer Spezialtiefbau constructed the complete excavation pit for the ZWEI project in Hannover
PILING

Excavation pits on former Pelikan grounds

UXO one of the challenges faced by Bauer teams during collaborative work on a Hannover jobsite

07 October 2022

 Bauer Spezialtiefbau has been creating diaphragm walls as part of its work on the excavation pit for the new building of exhibition hall 5 in Frankfurt
PILING

Bauer Spezialtiefbau back to excavate Frankfurt's Mainmetropolis again

Bauer Spezialtiefbau returns to Frankfurt for excavation pit construction project

02 September 2022

 Bauer Spezialtiefbau GmbH has been constructing a retaining structure with a total of 298 piles using the double rotary drilling system in Munich
PILING

Bauer constructs excavation pit in Munich's Central Station district

Unique drilling method employed by Bauer as it creates a retaining wall on a project in Germany

01 August 2022

 Bauer Spezialtiefbau Schweiz AG undertaking remedial measures to secure a dam in Schaan, Liechtenstein
GROUND CONTROL

Bauer Spezialtiefbau completes dam rehabilitation in Liechtenstein

Dam remediation work successfully undertaken by Swiss Bauer subsidiary

29 June 2022

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.