carbon capture

 Autonomous underwater vehicles will be used along a robotic seafloor drill by Fugro on a marine site investigation job in Indonesia
SITE INVESTIGATION

Fugro to survey for marine LNG and carbon capture and storage project

An underwater robotic drill among kit to be used for marine site survey by Fugro in Indonesia

07 March 2024

 Fugro is performing a range of in-depth geotechnical assessments as well as in situ testing to deliver a comprehensive set of factual ground data at the Keadby 3 site
SITE INVESTIGATION

Fugro's data supports development of flexible power station with carbon capture

A carbon capture power station project is benefiting from site investigation by Fugro

17 January 2023

 Rig and Well Services has commenced drilling operations for CO2CRC’s Otway Stage 3 Project in south-western Victoria
GROUNDWATER

Rig and Well Services provides drilling services for carbon-capture project

Drilling has begun in Australia by Rig and Well Services for a carbon capture project

28 September 2022

 Surface installations at the CMC field research station where the connection between the CO2 tank and the injection well is visible
GROUNDWATER

CGG Joins CCUS monitoring research programme led by CMC

CMC's carbon capture and storage programme has been joined by geoscience technology specialist CGG

08 February 2022

 The Transocean Enabler will be used to drill one carbon injection well and a sidetrack for another carbon injection well in support of the Northern Lights Carbon Capture Storage Project
INFRASTRUCTURE

Transocean Enabler to drill for Northern Lights Carbon Capture Storage Project

Carbon injection well drilling to be undertaken by Transocean off Norwegian coast

19 January 2022

 Alternative foundation methods, including timber piles, are being explored to allow peatland to be retained when new housing is built in rural and remote Scottish locations
PILING

New construction methods could unlock housing developments in rural Scotland

Alternative foundation methods could allow peatland to be retained at building projects

06 July 2021

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.