cutterhead

 The cutterhead from HS2’s TBM Dorothy being moved on a 12m long, 48-wheel self-propelled trailer
INFRASTRUCTURE

HS2 TBM cutterhead's overnight journey to start second dig

Night-time operation takes the HS2's 'Dorothy' TBM's cutterhead back to Long Itchington Wood Tunnel

26 September 2022

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.