Dawlish

 Following its successful delivery of Dawlish sea wall, BAM has started work on a £37.4 million cliff resilience project for Network Rail
GROUND CONTROL

Work begins on cliff resilience scheme to protect a south west UK railway line

Railway slope stabilisation work by BAM in South West of UK will include soil nailing and netting

29 August 2023

 Following on from its work installing piles, Bam Nuttall, working on behalf of Network Rail, is now installing wall panels along the railway line at Dawlish in Devon
GROUND CONTROL

Key milestone reached in Dawlish rail line work

Network Rail project sees BAM Nuttall grout concrete panels in place following piling work

03 August 2021

 The low carbon concrete is being used to backfill behind the piles as the new sea wall is built at Dawlish
INFRASTRUCTURE

Low-carbon concrete turns Dawlish sea wall a greener shade of grey

Low carbon concrete brings benefits to railway sea wall construction project

24 June 2021

 The jack-up barge Wavewalker will be used when BAM Nuttall undertakes piling work on the bigger sea wall at Dawlish, Devon
INFRASTRUCTURE

Work begins on second section of new Dawlish sea wall

Working on behalf of Network Rail, BAM Nuttall is employing a jack-up barge for sea wall piling

11 November 2020

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.