December2019: 2 of 2

MINING

The loneliness of the remote location driller

Paul Grad examines the challenges that need to be overcome when drilling in remote locations

18 November 2019

MINING

Faster, lighter DTH hammers from Epiroc

The COP M-series DTH hammers from Epiroc are said to be faster, lighter and longer lasting

18 November 2019

GROUNDWATER

Drilling water wells: getting down and dirty

A check list for successful water well drilling form Lone Star Drills

15 November 2019

PILING

In Awe of the Volcano: Drilling in the shadow of the Nevado del Tolima

A comparison between man and machine on a piling project in Colombia

11 November 2019

VIEWPOINT

Technology skills for the future of the geotechnical industry

The learning and development needs of the piling sector requires a thoughtful and vigorous approach

07 November 2019

PILING

The electric revolution begins in Austria

After debuting at Bauma, Liebherr's battery electric LB 16 piling rig goes live on site in Austria

07 November 2019

INFRASTRUCTURE

Drilling in the city

HDD work in South American cities presents challenges that rigs from Vermeer are able to conquer

28 October 2019

PARTNER CONTENT

From variability to control, Molycop's OreVia platform

How Molycop's OreVia works in practice and the operational value it is delivering

PARTNER CONTENT

Full flowsheet, full lifecycle: FLS sharpens its performance focus

Qasim Abrahams explains how FLS helps miners improve performance across full processing

PARTNER CONTENT

The Mineral Processing Report 2026 is here!

Unlock the Future of Mineral Processing