Dieseko Group

 The first Waltman 90DRe electric piling rig has been handed over to BAM Infra Nederland
PILING

First Woltman 90DRe handed over to BAM Infra Nederland

First large scale electric rig from Diesko Group goes into active service with BAM

07 March 2023

 Danfoss Power Solutions’ Editron division and Webasto Group announcing their strategic partnership at bauma 2022
INFRASTRUCTURE

Danfoss and Webasto announce partnership to electrify off-highway industry

Strategic partnership sees Danfoss join forces with Webasto to push electrification among OEMs

27 October 2022

 Commissioned by GSF Rail Infra, Dieseko has developed a clamp for a railway foundation element
PILING

Dieseko develops a special pile clamp

Commissioned by GSF Rail Infra, Dieseko has developed a clamp for a railway foundation element

01 June 2022

 Woltman is developing an electric version of its 90DR piling rig for delivery to Bam Infra later this year
PILING

Woltman goes electric with the 90DR-e for BAM

BAM to get first electric 90DR-e drilling rig in development by Woltman

02 May 2022

 Using Dieseko Group’s PVE 500M Normal Frequency Vibratory Hammer four 26m piles were extracted at the Lely offshore wind farm in the Netherlands
PILING

Raising to the challenge - Today's pile extraction solving tomorrow's problem

A look at how the pile extraction technology of today can solve the problems of tomorrow offshore

14 April 2021

 The 2308SG side gripper from Dieseko has a number of unique features
PILING

New side gripper guarantees higher reliability compared to existing methods

The 2308SG side gripper from Dieseko has features that set it apart from the competition

15 November 2019

 Hydraulic piston-cylinder geometry generates a high-magnitude, high-frequency oscillating force on the piles
PILING

A new method for driving piles free of ground-borne vibrations

Dieseko is gaining acceptance for a new method of driving piles with its PVE RD 260 pile driver

30 April 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.