Dortmund

 Bauer Spezialtiefbau GmbH was commissioned with the installation of a total of 301 foundation piles with a diameter of 880mm and a length of up to 24m at a job site in Dortmund
PILING

Bauer installs foundation piles in Dortmund

Bauer installs over 300 880mm diameter piles with lengths of up to 24m at a job site in Dortmund

20 October 2021

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.