duty cycle crawler crane

 The stability of the Liebherr LRH 600 piling rig working on the foundation piles for the railway bridge in Minnevika is maintained even on the jack-up barge
INFRASTRUCTURE

The foundations for Norway's longest railway bridge

Liebherr meets the specialist needs of Aarsleff for a Norwegian bridge piling job

26 March 2021

 The new LRB 23 compact piling and drilling rig from Liebherr closes the gap between company’s LRB 16 and the long-proven LRB 355
PILING

Liebherr premiers new machinery

Electrification a key part of new product range launch by Liebherr

02 December 2020

 The LSC 8-18 L slurry wall cutter supplied by Liebherr making its premiere in Munich on a major infrastructure project
INFRASTRUCTURE

When once round the world just is not enough

A Liebherr LSC 8-18 L slurry wall cutter debuts on a major German infrastructure project

26 May 2020

 Teh SR-75 is the first rig to be produced by Soilmec in its Blue Tech product line
PILING

Soilmec debuts Blue Tech line with the launch of the SR-75

The SR-75 is the first drill rig to be launched by Soilmec under its Blue Tech product line

31 January 2020

 Aerial view of the new Liebherr subsidiary in Hamburg with administration building (foreground) and workshop (background)
PILING

Liebherr opens new subsidiary at Hamburg Port

A €20 million investment is being made at the Hamburg Port as Liebherr opens a subsidiary on site

11 September 2019

 Keller is using a Liebherr HS 8130 with vibroflot for the soil compaction work
GROUND CONTROL

Visions of the Emirates: when the superlative becomes reality

The involvement of Liebherr in Keller's development of a new port in the United Arab Emirates

09 September 2019

 The HS 8130.1 is designed as carrier machine for the slurry wall cutter LSC 8-18.
PILING

Liebherr's new attachment - the LSC 8-18 slurry wall cutter

Liebherr's latest package for slurry wall applications is the LSC 8-18

29 May 2019

 Handing over the keys to a Liebherr HS 8070 at Bauma
PILING

Liebherr hands duty cycle crawler crane keys over at Bauma

Customer collects keys for Liebherr duty cycle crawler crane at opening of Bauma 2019

16 April 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.