Future Generation

 Florence, the third and final tunnel-boring machine (TBM) for Snowy 2.0, Australia’s largest hydropower project has now been commissioned
INFRASTRUCTURE

Third TBM commissioned for Snowy 2.0 hydroelectric project

Third and final TBM commissioned for Australian 2,000MW hydroelectric project

01 April 2022

 Built by Future Generation - a joint venture between Webuild, Australian partner Clough and Lane Construction, a US subsidiary of Webuild - Snowy 2.0 will link the existing Talbingo Reservoir with Tantangara Reservoir through a network of tunnels
INFRASTRUCTURE

Australian PM attends launch of second TBM at Snowy 2.0

Technologically advanced TBM to be employed on Australian infrastructure project

13 December 2021

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.