Germany: 10 of 20

 The first LR 1160.1 unplugged leaves the Liebherr plant in Nenzing
PILING

Electrifying: Liebherr's LR 1160.1 unplugged

The LR 1160.1 unplugged crawler crane is the latest all electric offering from Liebherr

04 March 2022

 At Germany’s MARK 51°7 the old tunnel of the former Dannenbaum colliery has been reached and is now being checked whether mine water can be pumped to the surface to create geothermal energy
GEOTHERMAL

Geothermal drilling progresses at MARK 51°7 in Germany

Early success with geothermal drilling project at a German technology business park

14 February 2022

 Professor Rolf Bracke (left) being awarded an adjunct professorship by RWTH Rector Professor Ulrich Rüdiger
GEOTHERMAL

Fraunhofer IEG geothermal expert is awarded adjunct professorship

Adjunct Professor role awarded to Rolf Bracke in order to develop geothermal technology in Germany

11 February 2022

 A joint roadmap by researchers from the Fraunhofer Society and the Helmholtz Association shows that deep geothermal energy could cover more than a quarter of Germany's annual heat requirements
GEOTHERMAL

German researchers publish geothermal roadmap

Roadmap for the future of geothermal energy use in Germany published by researchers

07 February 2022

 Bauer is constructing a 6,000m² single-anchored, mixed-in-place cut-off wall with a thickness of 550mm and embedded double U king piles up to a depth of 17m at a project in Munich
PILING

Bauer constructs excavation pit for office building in Munich

Multiple ground engineering techniques being employed by Bauer on foundation project in Munich

13 December 2021

 With an operating weight of 10t and an on-board diesel engine, the KR 800-3G is the lightest and smallest model in the Klemm 800 series
PILING

Klemm's KR 800-3G - a new compact class drilling rig

The KR 800-3G is the latest drill rig in the Klemm compact class product range

10 December 2021

 The Bauer Umwelt groundwater treatment plant purifies 12.5m3 of polluted water per hour
GROUNDWATER

Cleaning polluted groundwater from a railway car production site

The role Bauer Umwelt Division is playing in remediating ground water at a former industrial site

08 December 2021

 Developments such as its Unplugged series of electric rigs and cranes has seen Liebherr awarded a gold medal for sustainability by independent corporate responsibility auditor EcoVadis
PILING

Liebherr-MCCtec awarded gold sustainability rating from EcoVadis

Independent auditor EcoVadis awards gold medal for sustainability to Liebherr-MCCtec

02 December 2021

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.