kelly drilling: 2 of 2

 The renovation of the Aare railway bridge in Switzerland required a spectacular application for a Liebherr LB 36 piling rig
INFRASTRUCTURE

Historical railway bridge turns into a challenge

Difficult conditions were no challenge for a Liebherr rig on a marine piling job in Switzerland

28 February 2020

As soon as the final commissioning for the first BG 33 in Europe was done by Bauer Equipment UK at Cementation Skanska’s specialist plant facility, it was put to work on a project in the north of England
PILING

Cementation Skanska's modern successor of an old favourite

How Bauer's newly introduced BG 33 V rig went from Bauma to a job site in the UK

10 February 2020

 Mincivil successfully making use of an LB 36 to install piles in Ibagué
PILING

In Awe of the Volcano: Drilling in the shadow of the Nevado del Tolima

A comparison between man and machine on a piling project in Colombia

11 November 2019

 Bauer has been commissioned to execute an approximately 13.5km stretch of cut-off wall at the Herbert Hoover Dike in Florida
PILING

Bauer returns to Herbert Hoover Dike

Bauer once again returns to work on Herbert Hoover Dike on behalf of the US Army Corps of Engineers

30 October 2019

 Bauer’s Foundation Simulator replicates the interior of a rig operator’s cab
PILING

The foundations of safe simulations

Bauer's Foundation Simulator allow users to train on the company's equipment in a safe environment

06 March 2019

 The adaptive Kelly speed assistant from Bauer in Bangkok
CONSTRUCTION & FOUNDATIONS

Bauer's adaptive Kelly speed assists at One Bangkok

Bauer's adaptive Kelly speed assistant is put through its paces at One Bangkok project

03 December 2018

 The first Colombian female machine operator to take the controls of a piling and drilling rig: Adriana Gómez Beltrán
CONSTRUCTION & FOUNDATIONS

Women take control of Liebherr rigs in Colombia

Mincivil employs women to operate Liebherr LRB 355 drill rigs on Colombian infrastructure project

15 October 2018

Comacchio's CH 650 gets to work
CONSTRUCTION & FOUNDATIONS

Comacchio's CH 650 gets to work

The first Comacchio CH 650 rig is working on a power line extension project in Texas, US

05 October 2017

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.