MHWirth

 MHWirth’s pile top drill rigs in operation at Mumbai Trans Harbour Link project
PILING

MHWirth pile top drill rigs for Mumbai Trans Harbour Link

MHWirth pile top drill rigs are beign used in India on the Mumbai Trans Harbour Link project

25 November 2019

MHWirth rig piles in Mumbai
ISSUE

MHWirth rig piles in Mumbai

MHWirth's PBA 615 pile top drill rig is advancing India's ambitious infrastructure project.

29 August 2017

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.