MIP

 A milling cutter from HITEC Road will be used during the programme of dyke reinforcement in the Netherlands where the mixed-in-place method will be used to stabilise the waterways
GROUND CONTROL

Van Oord and HITEC Road to use MIP method for dyke reinforcement

MIP method to be used for Dyke reinforcement in innovative Netherlands partnership programme

27 February 2024

 The mixed in place (MIP) technique is being used by Bauer to create 12,000m2 of static retaining wall constructed up to a depth of 18m at a project in Frankfurt
PILING

Bauer's MIP retaining wall at Frankfurt residential quarter Westville

The MIP technique is being used to create 12,000m2 of retaining wall at a project in Frankfurt

11 August 2021

 Bauer is using an RTG RG 25 S to install a mixed-in-place sealing wall parallel to the Rhine in Germany
INFRASTRUCTURE

Mixed-in-place sealing wall for flood protection

Bauer is creating 28,000m² of MIP sealing wall for a project along the Rhine river in Germany

21 November 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.