South Carolina

 UMA proposed to the owner and the design team that a 4600sq.ft permanent soil nail wall with reinforced shotcrete facing was required since a 3:1 slope to connect the building with the grading below the MSE wall was impossible
GROUND CONTROL

Uncommon MSE wall failure calls for unique geotechnical solutions

Constantly changing conditions caused the need for flexible project planning and new ideas on site

02 November 2022

 Vermeer dealer Vermeer Northeast has been acquired by Vermeer Mid Atlantic
INFRASTRUCTURE

Vermeer Mid Atlantic acquires Vermeer Northeast

Acquisition of Vermeer Northeast dealership chain leads to name change for Vermeer Mid Atlantic

20 August 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.