Vienna

 The Herrenknecht EPB Shield for the extension of the subway line 2 in Vienna will excavate two 2.1km tunnels to increase the efficiency of public transport in the Austrian capital
INFRASTRUCTURE

Herrenknecht presents tunnel boring machine for Vienna

Herrenknecht supplied TBM set to bore under Austrian capital as part of subway expansion programme

20 February 2024

 The start of tunnelling work in Vienna for the new U2 metro line at Matzleinsdorfer Platz
INFRASTRUCTURE

PORR and STRABAG's U2 tunnelling works at Matzleinsdorfer Platz

Work is underway to create the tunnels for a new metro line underneath the streets of Vienna

16 June 2022

 A Bauer BG 45 and a BG 40 during drilling work for the U2/22 Friedrich-Schmidt-Platz shaft as part of the extension of the metro system in Vienna
PILING

Bauer installs the deepest bored piles in Vienna

As part of the extension of Vienna's subway, Bauer Spezialtiefbau is installing 35,000m of piles

13 January 2022

 Bauer Spezialtiefbau has been commissioned by HT Generalunternehmer & Industriebau to construction the deep foundations for a new IKEA store in Vienna
PILING

Bauer's foundation works for IKEA store at Vienna's Westbahnhof

When IKEA decided to build a new store in Vienna, Bauer was called upon for foundation work

24 April 2020

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.