Specifically, Bauer Keller JV (BKJV) has been appointed by client SeAH Wind to provide multiple rigs to install approximately 1500nr bored piles (1180 - 1050mm diameter) to around 35mbgl and
date:28/03/2022
location:Sofitel Sydney Wentworth, Australia
Meet the industry leaders who shape the Future of Mining in Australia
date:26/09/2022
location:Denver, Colorado, USA
Meet the industry leaders who shape the Future of Mining in the Americas
date:18/09/2023
location:Perth
Meet the industry leaders who shape the Future of Mining in Australia
date:18/09/2023
location:Pan Pacific Perth
Meet the industry leaders who shape the Future of Mining in Australia
The joint venture of Bauer Technologies and Keller UK has been awarded the piling contract for the construction of a new £300 million wind turbine monopile manufacturing facility in Teesside, UK, which when fully operational, is expected to produce between 100 and 150 monopiles per year, for transporting directly from the factory to Teesworks’ new South Bank Quay facility, before heading to the North Sea for installation.
Specifically, Bauer Keller JV (BKJV) has been appointed by client SeAH Wind to provide multiple rigs to install approximately 1500nr bored piles (1180 - 1050mm diameter) to around 35mbgl and
Four rigs employed by Van Elle to install 16,000 No. vibro stone columns on a UK site
Gain Ground on the Competition
Simplify your geotechnical Jobs
Gain Ground on the Competition
Simplify your geotechnical Jobs