Bauer Umwelt

 The Bauer Umwelt division of Bauer Resources in collaboration with Bauer Spezialtiefbau is constructing the 15,000m2 excavation pit for the last section of a development in Frankfurt
PILING

Bauer's excavation pits on a former military site

Bauer's work on an excavation pit is the first stage of redevelopment of wasteland in Frankfurt

09 September 2022

 The Bauer Umwelt groundwater treatment plant purifies 12.5m3 of polluted water per hour
GROUNDWATER

Cleaning polluted groundwater from a railway car production site

The role Bauer Umwelt Division is playing in remediating ground water at a former industrial site

08 December 2021

 The Bauer Umwelt Division of Bauer Resources GmbH has over several years developed the EcoVert technology that is decontaminating groundwater at the site of a former refinery in Leuna, Germany
GROUNDWATER

Groundwater treatment with a green core

Bauer group specialisms include the development of water treatment systems in Germany

14 June 2021

 Bauer Umwelt, a division of Bauer Resources GmbH, is undertaking soil remediation work at the site of a former laundry in the Laubegast district of Dresden, Germany
PILING

Remediation of a former laundry site

Piling work included in soil remediation project at site of former laundry plant in Germany

10 May 2021

 Bauer made use of a GPS-controlled excavator as part of the digitisation of a job site in the German city of Munich
PILING

Digitalisation on the site

Digital solutions, including a drone, embraced by Bauer at a job site in Munich

02 April 2021

 A total of 18,000m3 of soil was excavated and 3,600m3 of ground was replaced when Bauer Umwelt executed turnkey excavation pit in Eschborn, Germany
PILING

Bauer Umwelt executes turnkey excavation pit for senior citizen housing

Bauer provides foundation work for new senior citizen housing project

04 November 2020

 Over the past 30 years, the Bauer Umwelt business division of Bauer Resources GmbH has developed into a leading company for environmental technology
INFRASTRUCTURE

Three decades of environmental technology in the Bauer Group

The development of Bauer Umwelt over 30 years to become a leader in the remediation sector

08 October 2020

 The Bauer Umwelt division of the Bauer Resources has recently completed project in Karlsruhe to install around 404 geothermal probes to both heat and cool buildings
GEOTHERMAL

Bauer Umwelt builds geothermal plant

A Bauer division has drilled geothermal probes for a two-way underground energy system

10 August 2020

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.