Duncan Moore: 213 of 282

GEOTHERMAL

Icelandic 20km geothermal pipeline construction begins

Icelandic, state-owned utility company, Rarik has begun construction of a 20km geothermal pipeline

03 January 2020

SITE INVESTIGATION

Idom Merebrook remediation work at site of former match factory

The work needed to make the site of a former match factory safe for a residential development

18 December 2019

SITE INVESTIGATION

Socotec helping to develop the next generation of ground engineers

Socotec is enhancing the employability of geoengineering students at the University of Portsmouth

18 December 2019

SITE INVESTIGATION

Fugro wins nearshore site characterisation contract for Copenhagen megaproject

Fugro is mobilising its Skate 3 modular jack-up as part of a megaproject in Denmark

16 December 2019

MINING

Sandvik's new Dino DC410Ri offers two years of upgrades over previous model

Two years' worth of upgrades have been undertaken by Sandvik to create the Dino DC410Ri drilling rig

06 December 2019

PILING

Fraste Mito 40 CS with separate power pack

Fraste manufactures its Mito 40 CS rig to allow foundation drilling in confined spaces

02 December 2019

PILING

Skelair expands hire fleet with the UK's first Marini MR-C 50

The latest addition to the Skelair International rental fleet is a first for the UK market

02 December 2019

VIEWPOINT

It's been a funny old year

GDI's editor takes a look back over a year in drilling that's been overshadowed by UK politics

29 November 2019

PARTNER CONTENT

From variability to control, Molycop's OreVia platform

How Molycop's OreVia works in practice and the operational value it is delivering

PARTNER CONTENT

Full flowsheet, full lifecycle: FLS sharpens its performance focus

Qasim Abrahams explains how FLS helps miners improve performance across full processing

PARTNER CONTENT

The Mineral Processing Report 2026 is here!

Unlock the Future of Mineral Processing