Infrastructure: 93 of 109

INFRASTRUCTURE

Bauer completes works on the Monte Grande dam

The first use of a trench cutter in the Dominican Republic was by Bauer on a dam project

16 July 2020

INFRASTRUCTURE

Exlterra's MAZL - a drill rig for utility, fencing, and bollard installers

MAZL, an ultra-light and compact drilling rig, is the second rig model from Exlterra

16 July 2020

INFRASTRUCTURE

London super sewer TBM arrives by river

Final TBM for London's super sewer arrives by boat along the river Thames

14 July 2020

INFRASTRUCTURE

Webuild gets Turin-Lyon high-speed railway tunnel contract

More European railway tunnelling work for Webuild as it works on Italy-France connection

14 July 2020

INFRASTRUCTURE

First jacket successfully installed at Moray East offshore wind farm

Following on from piling, DEME begins installation of jackets at Scottish offshore wind farm

08 July 2020

INFRASTRUCTURE

Numa adds HDD 80 to product line

Numa adds the HDD 80 range to its HDD drilling systems product line

08 July 2020

INFRASTRUCTURE

Bauer to install Saint-Brieuc offshore wind farm piles with Van Oord

Bauer is supporting Van Oord during the foundation piling for the Saint-Brieuc offshore wind farm

03 July 2020

INFRASTRUCTURE

Charlotte completes tunnel under Thames

A 26-year-old tunnelling machines has completed work under London's River Thames

03 July 2020

PARTNER CONTENT

From variability to control, Molycop's OreVia platform

How Molycop's OreVia works in practice and the operational value it is delivering

PARTNER CONTENT

Full flowsheet, full lifecycle: FLS sharpens its performance focus

Qasim Abrahams explains how FLS helps miners improve performance across full processing

PARTNER CONTENT

The Mineral Processing Report 2026 is here!

Unlock the Future of Mineral Processing