Herrenknecht: 4 of 5

PILING

Second wind farm to use Herrenknecht OFD technology

DEME will employ Herrenknecht's OFD technology for a second time at the Noirmoutier wind farm

12 June 2024

INFRASTRUCTURE

HS2 launches fourth TBM under London

New tunnelling machine joins three others digging high-speed line under London

10 April 2024

UTILITIES

Breakthrough on the pipeline construction site in Kehl

A Herrenknecht AVN1200 has broken through on the Trans Europa Naturgas Pipeline project

03 April 2024

GEOTHERMAL

Arverne and Herrenknecht partner to create DrillDeep

Arverne Group partners with Herrenknecht AG for its deep geothermal drilling operations

02 April 2024

INFRASTRUCTURE

Final breakthrough for HS2's longest tunnel

The second TBM building HS2, the UK’s new high-speed rail link, under the Chiltern Hills has now broken

25 March 2024

INFRASTRUCTURE

Seventh TBM handed over for the record-breaking Brenner project

First of two Double Shield TBM for construction BBT project presented by Herrenknecht

20 March 2024

GROUNDWATER

Germany ready for drilling acceleration

Eugene Gerden reports that the geotechnical drilling sector in Germany is returning to growth

20 March 2024

INFRASTRUCTURE

Historic breakthrough for HS2's longest tunnel

Breakthrough has taken place on the longest tunnel of the UK's HS2 high-speed rail project

28 February 2024

PARTNER CONTENT

From variability to control, Molycop's OreVia platform

How Molycop's OreVia works in practice and the operational value it is delivering

PARTNER CONTENT

Full flowsheet, full lifecycle: FLS sharpens its performance focus

Qasim Abrahams explains how FLS helps miners improve performance across full processing

PARTNER CONTENT

The Mineral Processing Report 2026 is here!

Unlock the Future of Mineral Processing