LATEST HEADLINES : 106 of 630

The ElbX project enables the Südlink HVDC line to cross under the Elbe using a specially configured Mixshield designed for heterogeneous subsoil, high water permeability, and significant water pressure
INFRASTRUCTURE

Exploring the green: Herrenknecht at bauma 2025

Pioneering solutions and comprehensive services that pave the way to efficient tunnelling

03 March 2025

The conditions at the Coire Glas Pumped Hydro Storage project were some of the most challenging the Robertson Geo team has ever encountered
SITE INVESTIGATION

Borehole geophysical logging in extreme conditions

The Robertson Geo Services team discuss overcoming the challenges of working in extreme conditions

28 February 2025

Visitors to the Bauer stand can experience the successor model of the electric-hydraulic Klemm KR 806-3E
PILING

Bauer at bauma 2025 – Welcome to Bauer City

The opportunity to experience the latest drilling and anchor rigs, and cutter and piling tech

28 February 2025

Epiroc’s digital solutions deployed in Sweden’s mines and Norway’s tunnels.
INFRASTRUCTURE

Epiroc's safety solutions in use at LKAB mines

In Norway, the company is also applying its tunnelling tech to an undersea bridge

28 February 2025

Grouting work carried out with the aid of a Comacchio MC 22 rig allowed tunnelling to continue on the Snowy 2.0 project after a shink hole developed stopping the TBM
UTILITIES

The Snowy 2.0 project

The incorporation of innovative solutions allows tunnelling work to continue at Snowy 2.0 project

27 February 2025

Orica Digital Solutions’ AXIS Aligner enables safe fast and accurate rig alignment
CORE SAMPLING

Innovative new Axis Aligner released to market by Orica Digital Solutions

Orica Digital Solutions’ AXIS Aligner enables safe, fast and accurate rig alignment

27 February 2025

 KoBold Metals explorers
MINING

AI in mineral exploration - is it all hype?

Geoscientist Diana Benz on the missing link between data and discovery

27 February 2025

A survey found some students think geology and geoscience is just about rocks.
MINING

Fixing the geo-skills drain just got harder

Declining enrolments a real concern

26 February 2025

Using two powerful Klemm KR 805 rigs, two drilling teams executed roughly 5700 drilled metres for a geothermal project at a German high school
GEOTHERMAL

Geothermal heat system for a high school

Bauer is installing 57 geothermal probes at a depth of 100m in a German school playing field

26 February 2025

HS2’s Long Itchington Wood Tunnel in Warwickshire is the first deep tunnel on the high-speed route to complete its civil engineering phase
INFRASTRUCTURE

HS2 construction milestone for Balfour Beatty VINCI's

JV announces significant milestone at HS2’s Long Itchington Wood Tunnel in Warwickshire, UK

26 February 2025

PARTNER CONTENT

From variability to control, Molycop's OreVia platform

How Molycop's OreVia works in practice and the operational value it is delivering

PARTNER CONTENT

Full flowsheet, full lifecycle: FLS sharpens its performance focus

Qasim Abrahams explains how FLS helps miners improve performance across full processing

PARTNER CONTENT

The Mineral Processing Report 2026 is here!

Unlock the Future of Mineral Processing