LATEST HEADLINES : 189 of 633

 An exploratory well of around 500m being drilled in Weisweiler. The data from this project the next exploration steps
GEOTHERMAL

Geothermal exploration in the Rhineland

Geothermal exploration is underway in Weisweiler, which is a part of the Rhineland area in Germany

05 February 2024

 The TSi 150CCE is the combination of a Massenza’s Mi12 drilling rig mounted on a crawler and fitted with a Terra Sonic’s sonic head
SITE INVESTIGATION

Massenza's TSi 150CCE: the future of sonic drilling

The TSi 150CCE drill rig is the latest collaboration between Massenza and Terra Sonic

05 February 2024

 Exploration drilling is usually undertaken to confirm the presence of a mineral deposit and to determine its size and grade
SITE INVESTIGATION

What is mineral exploration?

What is mineral exploration? How did it start and where is it going?

05 February 2024

 SPT’s Gyroscout, gyroscope for blast hole quality control, with centralisers
SITE INVESTIGATION

Stockholm Precision Tools' GyroScout

GyroScout is SPT's advanced gyroscope for blast hole quality control

05 February 2024

 Numerous challenges have been faced in constructing the Guillermo Gaviria Echeverri Tunnel
INFRASTRUCTURE

Guillermo Gaviria Echeverri Tunnel: Another way to build road tunnels

Numerous challenges have been faced in constructing the Guillermo Gaviria Echeverri Tunnel

02 February 2024

 Ground Sun installed 80 Chance Helical Pulldown Micropiles in just two days as part of a rail depot upgrade at Heathrow Airport
PILING

Helping fuel London's Heathrow Airport

Helical pile solution allows for rapid completion of project to expand airport's rail depot

02 February 2024

 Red7Marine has been working on the infrastructure upgrades at the Outer Harbour at Port of Lowestoft
PILING

Red7Marine completes piling for Lowestoft Eastern Energy Facility

Piling work for Lowestoft Port supported by Red7Marine with its Haven SeaStabler

02 February 2024

 PDE Offshore Corporation has upgraded its underwater acoustic positioning system onboard MV Geo Energy to Sonardyne’s Ranger 2 USBL system
SITE INVESTIGATION

PDE Offshore upgrades to Sonardyne system for Taiwanese offshore exploration

Taiwanese site investigation contractor upgrades fleet to increase working capabilities

01 February 2024

 NGI’s research project at Campus Ullevål will provide knowledge about more sustainable construction in challenging ground conditions
PILING

The NGI uses construction process to develop new ways of designing and building

Difficult ground conditions provide the opportunity to establish new greener foundation techniques

01 February 2024

 Deep drilling work has begun for the geothermal doublet at the main plant of the engine manufacturer MTU Aero Engines in the north of Munich, Germany
GEOTHERMAL

Drilling starts for the geothermal energy project at MTU site in Munich-Allach

Drillings starts as German aero engine maker moves to geothermal resources for factory's needs

31 January 2024

PARTNER CONTENT

A decade in the mixing market

Challenges in developing tailored technologies – the EURODRILL RHP15 story

PARTNER CONTENT

From variability to control, Molycop's OreVia platform

How Molycop's OreVia works in practice and the operational value it is delivering

PARTNER CONTENT

Full flowsheet, full lifecycle: FLS sharpens its performance focus

Qasim Abrahams explains how FLS helps miners improve performance across full processing