PILING

Royal BAM Group receives Hütte Bohrtechnik HBR 610 drill rig

At the end of 2019, the first Hütte Bohrtechnik HBR 610 drill rig was officially handed over to BAM Infra Foundationworks, a subsidiary company of the Royal BAM Group nv.

 BAM Infra Foundationworks receiving its new HBR 610 drill rig from Hütte Bohrtechnik at the Terneuzen job site in the Netherlands

BAM Infra Foundationworks receiving its new HBR 610 drill rig from Hütte Bohrtechnik at the Terneuzen job site in the Netherlands

The Hütte HBR 610 is a radio remote-controlled drilling rig, which offers front-the-wall kinematics and a drill mast of 20t pullback force. It is equipped with a double head drilling system that has a maximum torque M of 5,200daNm; the drilling diameter is 177.8mm/114.3mm, the casing and rod length 3m with a drilling depth of 70m.

The Royal BAM Group nv will use the Hütte HBR 610 first on its job site at the sluice Terneuzen in the Netherlands for anchor drilling with a double-head unit, jet grouting and screw piles / self-drilling anchors.

The new rig will then be deployed for several other projects like Levvel and Brunsbuttel.

With the new Hutte HBR 610, BAM Infra Foundationworks is ready for future challenges in the field of civil engineering.

/

BAM Infra Foundationworks' new Hütte Bohrtechnik HBR 610 anchor drilling with a double-head unit, jet grouting and screw piles / self-drilling anchors