Further contracts have been awarded to Bauer as part of THE LINE mega project in Saudi Arabia
Deep sea mining project that includes Bauer takes top honours at bauma awards
UXO one of the challenges faced by Bauer teams during collaborative work on a Hannover jobsite
How to overcome the challenges of drilling deep, large diameter pile shafts from a barge on a river
Piling for a bridge project in Saudi Arabia sees Bauer operating a rig from a floating crane barge
Gateshead Quayside development coal seam consolidation work to be undertaken by Bauer
Piling work by Bauer in support of work for the world's largest offshore wind farm
Bauer rigs brought in to pile ice hockey world championship site in Russia
Australian contractor takes on challenging first job with a Bauer BG 45 piling rig
Bauer subsidiary to carry out piling work for significant Welsh road improvement project
A plan for the standardised licencing of piling and drill rig operators is being led by Bauer
Bauer goes electric with the launch of its eBG 33 - an electrically powered rig for soil mixing