bored piles: 2 of 4

 Keller has signed an umbrella Framework Agreement in respect of the NEOM Giga project in the Tabuk Province of North-West Saudi Arabia
PILING

Major new contract for Keller in Saudi Arabia

Keller wins contract for work on Saudi Arabian NEOM Giga project

30 June 2022

 A Soilmec SR-95 was chosen by contractors working on a rail project in Egypt to drill bored piles with a depth of 27m and a diameter of 2,400mm
PILING

Cairo Monorail chooses Soilmec rig

Speed and manoeuvrability make Soilmec's SR-95 the rig of choice for an Egyptian rail project

09 June 2022

 Trevi Foundations Philippines is installing large diameter cast in-situ bored piles for the country’s Metro’s Guideway-Viaduct
INFRASTRUCTURE

Trevi piles into Philippines Metro

Trevi Foundations Philippines is installing cast in-situ bored piles for a guideway-viaduct

12 May 2022

 After many decades of heavy foundation work, Keller in Indonesia made the strategic decision to focus on ground improvement instead
PILING

Keller ASEAN keeps busy on infrastructure projects

Keller is bringing its expertise to infrastructure projects in the ASEAN region

04 February 2022

 A Bauer BG 45 and a BG 40 during drilling work for the U2/22 Friedrich-Schmidt-Platz shaft as part of the extension of the metro system in Vienna
PILING

Bauer installs the deepest bored piles in Vienna

As part of the extension of Vienna's subway, Bauer Spezialtiefbau is installing 35,000m of piles

13 January 2022

 Casagrande has supplied two B400XP-2 rigs to work on the foundations for Egypt’s first monorail
INFRASTRUCTURE

Casagrande's part in Egypt's first monorail

Casagrande has supplied the rigs working on the foundations of Egypt's first monorail

27 October 2021

 Keller switched from sheet piles to bored piles with a jet grout seal and fewer anchors, reducing the risk of water ingress and settlement on a Norwegian job site at the request of the building developer’s designer
PILING

Keller brings expertise to hospital project

Expert knowledge allows Keller team to adapt to changing requirements on Norwegian job site

16 July 2021

 Casagrande’s new B470XP-2 multifunction rig provides extreme performance in cased CFA double head mode with 32m CFA and to 24m cased depth
PILING

Casagrande's new flagship rig

New Casagrande flagship B470XP-2 hydraulic piling rig in operation in UK

12 July 2021

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.