DecNews2021: 2 of 5

 Long-section through Northern Area of the ELD Deposit
CORE SAMPLING

Torex Gold's 2021 drill programme at ELG Underground

Torex Gold Resources releases of initial results 2021 drilling programme at El Limón Guajes

15 December 2021

 Fugro has opened a state-of-the-art testing laboratory on the construction site of Hong Kong International Airport’s Three-Runway System (3RS)
SITE INVESTIGATION

Fugro opens onsite testing laboratory for Hong Kong 3RS megaproject

Fugro opens test lab at Hong Kong construction site to speed up reporting times

15 December 2021

 AR2Tech’s algorithm library and engine for geostatistical modelling can be implemented in mining to enable conditional simulation and estimation models of complex orebodies
MINING

Seequent acquires Advanced Resources and Risk Technology (AR2Tech)

Advanced Resources and Risk Technology has been acquired by Bentley Systems' business Seequent

14 December 2021

 A team from Keller’s Geotechnique division has installed seven single bore multiple anchors (SBMA) to the tower on the English side of the 200-year-old Union Chain Bridge
INFRASTRUCTURE

Keller anchors help restore a piece of UK history

Keller's Geotechnique division installs anchors as part of historic bridge restoration project

14 December 2021

 Central Alliance Electrokinetic rig in operation highlighting the remediation in existing condition approach (including trees), providing significant environmental and sustainability benefits over alternative slope stabilisation techniques
GROUND CONTROL

Central Alliance acquires Electrokinetic

Company behind patented EKG technology for slope stabilisation acquired by Central Alliance

14 December 2021

 Built by Future Generation - a joint venture between Webuild, Australian partner Clough and Lane Construction, a US subsidiary of Webuild - Snowy 2.0 will link the existing Talbingo Reservoir with Tantangara Reservoir through a network of tunnels
INFRASTRUCTURE

Australian PM attends launch of second TBM at Snowy 2.0

Technologically advanced TBM to be employed on Australian infrastructure project

13 December 2021

 Bauer is constructing a 6,000m² single-anchored, mixed-in-place cut-off wall with a thickness of 550mm and embedded double U king piles up to a depth of 17m at a project in Munich
PILING

Bauer constructs excavation pit for office building in Munich

Multiple ground engineering techniques being employed by Bauer on foundation project in Munich

13 December 2021

 HS2 CEO Mark Thurston pushes the button to start Dorothy the first TBM to begin work on the rail infrastructure project
INFRASTRUCTURE

HS2 launches first Midlands tunnelling machine

First TBM on the Midlands section of HS2 begins one-mile tunnelling journey

10 December 2021

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.