JanNews2021: 3 of 7

 Fugro’s multi-disciplinary consultancy services will support the design of Germany’s SuedLink wind powerline route
INFRASTRUCTURE

Fugro wins multidisciplinary SuedLink contract

Fugro gets geotechnical and water consulting contract from Vössing Engineers for German wind project

20 January 2021

 TerraQuip has recently performed the first IMT A140 low headroom bored pile conversion in Australia, for its client Ezyquip Hire
PILING

TerraQuip's first IMT A140 low headroom bored pile conversion in Australia

TerraQuip has performed the first IMT A140 low headroom bored pile conversion in Australia

19 January 2021

 A 250m tunnel has been excavated below ground from Tideway’s Falconbrook Pumping Station site to the main super sewer tunnel
INFRASTRUCTURE

Connection tunnel completed at Tideway's Falconbrook pumping station

Latest Tideway tunnel under Thames river completed using concrete spraying technique

19 January 2021

 Wallbridge is changing its focus at the Fenelon gold project in Canada in order to focus on a larger scale operation
MINING

Wallbridge announces drilling and underground development at Fenelon

Larger drill programme approved by Wallbridge board for company's Fenelon gold property

19 January 2021

 The track-mounted CX 1515 is one of 10 new rig designs that make up the new CX line (Comacchio eXploration line), which is being launched as the Italian manufacturer targets the mining exploration sector
MINING

Comacchio launches new line of exploration drilling rigs

The new CX line (Comacchio eXploration line) see Italian rig maker turn focus on mining sector

19 January 2021

 Hy-Tech Drilling will conduct core drilling at District Metals's polymetallic Tomtebo property in south-central Sweden
CORE SAMPLING

District executes drilling contract for Tomtebo Property

District Metals Corp has contracted Hy-Tech Drilling Sweden AB to conduct core drilling at Tomtebo

18 January 2021

 Dragon Drilling has taken delivery of the first of five new rigs ordered from Geotec of Nirdkirchen, Germany
SITE INVESTIGATION

Dragon Drilling expands with new Rotomax drill rig

First of five new Geotec rigs ordered from Germany by Dragon Drilling delivered to the UK

18 January 2021

 A Bauer BG 40 is being utilised by Bauer Spezialtiefbau for the construction of the CFA piles on a joint project it is working on in Aschaffenburg, Germany, with Michel Bau GmbH
INFRASTRUCTURE

Bauer's excavation pit with a view

Bauer Spezialtiefbau is working with Michel Bau GmbH under the umbrella of the Willigisbrück JV

15 January 2021

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.