Klemm: 2 of 4

 The mixed in place (MIP) technique is being used by Bauer to create 12,000m2 of static retaining wall constructed up to a depth of 18m at a project in Frankfurt
PILING

Bauer's MIP retaining wall at Frankfurt residential quarter Westville

The MIP technique is being used to create 12,000m2 of retaining wall at a project in Frankfurt

11 August 2021

 MIP walls were created by Bauer Spezialtiefbau for an indoor skydiving centre in Germany using an RTG RG 25 up to a drilling depth of 16m with structural king piles vibrated into the fresh MIP wall with an RTG RG 19 T
PILING

Bauer constructs excavation pit for a new indoor skydiving facility

An indoor skydiving centre is the latest construction project to benefit from Bauer's knowledge

10 March 2021

 Working with the US Army Corps of Engineers, Bauer Foundation Corp is undertaking the remediation of the Herbert Hoover Dyke, Florida
INFRASTRUCTURE

Flood defence in the USA: Important projects for Bauer Foundation Corp

Examining the flood defence work Bauer is undertaking with the US Army Corps of Engineers

22 February 2021

 A Bauer Spezialtiefbau GmbH and Weimer GmbH joint venture is working on a new exhibition hall at Messe Frankfurt, Germany
PILING

Bauer piles into new exhibition hall in Frankfurt

Piles for an excavation pit for a new exhibition hall in Frankfurt are Bauer's latest project

06 August 2020

 ECA will enhance its line of slurry handling equipment following Bauer MAT’s acquisition of Mühlhäuser-Obermann GmbH
PILING

ECA to bring Obermann products to North American markets

The product range available from ECA now includes Germany's Mühlhäuser-Obermann GmbH

04 March 2020

 The installation of the pile foundation for the southern ramp of the future Maas Delta Tunnel, which is 30m deep, began in the summer of 2019.
PILING

Bauer's micro-pile solution for Rotterdam tunnel project

How 10,000t of GEWI material will be installed by Bauer as 4,500 individual piles in Rotterdam

04 February 2020

 An architectural impression, by Tonkin Liu architects, of the Tower of Light in Manchester
PILING

Van Elle installs foundations for Manchester's Tower of Light

Van Elle provides foundations for beacon to sustainable energy solutions in Manchester

29 January 2020

 A KLEMM KA 162 equipped with the KD 1215R hydraulic drifter mounted on an excavator being used on the Albert Canal, Belgium
GROUND CONTROL

Technically demanding anchor drilling in the Albert Canal

Soil nailing a Belgian canal saw KLEMM supply a range of specialist equipment to the main contractor

09 January 2020

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.