MayNews2020: 3 of 5

 SALPDH-16 1.0m vein with massive sulphide (pyrite-sphalerite-galena) in centre with closed spaced carbonate- quartz veinlets plus two per cent pyrite in hanging wall contact taken from Outcrop Gold’s Colombian project
MINING

Exploration and drilling updates on Santa Ana from Outcrop Gold

Latest updates on Colombian silver-gold project released by Outcrop Gold Corp.

22 May 2020

 Wärmeverbund Riehen AG is planning a second geothermal plant in Switzerland to meet the increased demands for district heating networks
GEOTHERMAL

Wärmeverbund Riehen AG is planning a second Swiss geothermal plant

Plans in place to increase use of geothermal energy in Switzerland

20 May 2020

 Once the conversion work is compete, Boskalis will have a 4,000t crane installed on its vessel, Bokalift 2, in 2021
INFRASTRUCTURE

Important milestone for Bokalift 2 crane vessel conversion

Milestone reached in conversion work on Boskalis' Bokalift 2 crane vessel

20 May 2020

 The e-HME is one of two new water pumps launched by Goulds Water Technology that feature integrated and variable speed control and intelligence
GROUNDWATER

Goulds Water Technology launches comprehensive variable speed system

New water pumps with integrated and variable speed control and intelligence launched by Goulds

19 May 2020

 Boart Longyear has opened a new stocking facility in Wytheville, Virginia, USA
MINING

Boart Longyear opens new facility in Virginia, USA

New stocking facility opened by Boart Longyear to service eastern and central US markets

19 May 2020

 A computer rendering of one of the HS2 tunnel boring machines set be named in a vote by the UK public
INFRASTRUCTURE

HS2 asks UK public to choose the names for its first two tunnelling machines

TBMs for UK's HS2 rail link to be named by public vote

19 May 2020

 Work is set to resume on London super sewer after lifting of COVID-19 lockdown restrictions
INFRASTRUCTURE

Tunnelling re-starts on Thames Tideway super sewer

Tunnelling to restart on London's Thames super sewer after lifting of COVID-19 restrictions

18 May 2020

 As one of the contractors working on the Munich central railway station project, Bauer is installing diaphragm walls
INFRASTRUCTURE

Bauer starts diaphragm wall works at the central Munich railway station

Working on a Munich infrastructure project, Bauer is creating diaphragm walls for a rail station

15 May 2020

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.