3D slope stability  analysis of an open pit mine

3D slope stability analysis of an open pit mine

How specialist software was used to analyse the slope stability of an open pit mine

Surface Drilling

06 APRIL 2020
Integrated drill and blast  a catalyst for productivity gains

Integrated drill and blast a catalyst for productivity gains

Examining how greater integration can improve drill and blast productivity at mine sites

Underground Drilling

03 APRIL 2020
Digital delivery of GDI

Digital delivery of GDI

How GDI is responding to the COVID-19 situation and its affect on our industry

Editor's Comment

02 APRIL 2020
MinePortal adds auto void  detection to list of solutions

MinePortal adds auto void detection to list of solutions

A closer look at how machine learning can be used to benefit the mining sector

Underground Drilling

30 MARCH 2020
Fatigue - A topic best not slept upon

Fatigue - A topic best not slept upon

Is fatigue from long working hours and time spent travelling to job site putting operators at risk?

Industry voice

27 MARCH 2020
Centring on customers' needs; XCMG Piling Machinery's North American journey

Centring on customers' needs; XCMG Piling Machinery's North American journey

The biggest plant manufacturer you have never heard of targets North American market

Piling

26 MARCH 2020
Russian scientists develop well drilling technology

Russian scientists develop well drilling technology

New digital technology is being developed in Russia to improve water well location prior to drilling...

Wells & Boreholes

26 MARCH 2020
Down with the top hammer method

Down with the top hammer method

A look at the emerging challenges and solutions in the top hammer drilling sector

Underground Drilling

25 MARCH 2020
Addressing the handpump  corrosion and material quality challenge

Addressing the handpump corrosion and material quality challenge

Kerstin Danert looks at the issue of handpump corrosion at well sites in west Africa

Industry voice

23 MARCH 2020
Bauer goes back to Bhutan

Bauer goes back to Bhutan

Bauer is constructing a dam, a pressure tunnel and several caverns in power plant complex in Bhutan

Keller helps Neste towards a greener future

Keller helps Neste towards a greener future

By making use of colleagues from the wider group, Keller Singapore completed a complex job

Piling

06 MARCH 2020
Historical railway bridge turns into a challenge

Historical railway bridge turns into a challenge

Difficult conditions were no challenge for a Liebherr rig on a marine piling job in Switzerland

Infrastructure & Utili...

28 FEBRUARY 2020