Egypt

 A Soilmec SR-95 was chosen by contractors working on a rail project in Egypt to drill bored piles with a depth of 27m and a diameter of 2,400mm
PILING

Cairo Monorail chooses Soilmec rig

Speed and manoeuvrability make Soilmec's SR-95 the rig of choice for an Egyptian rail project

09 June 2022

 Capital Drilling contracted by Aton for drill programme at Hamama West development project
CORE SAMPLING

Aton contracts Capital Drilling for drilling programme at Hamama

Capital Drilling contracted by Aton for drill programme at Hamama West development project

09 March 2022

 The Arab Contractors Company used a Vermeer D130X150 horizontal directional drill into the grounds of the island's Sofitel El Gezirah Hotel during a job in Egypt
INFRASTRUCTURE

Water dance resumes after a 40-year break

The part played by Vermeer HDD technology on major Egyptian drilling projects

28 January 2022

 Casagrande has supplied two B400XP-2 rigs to work on the foundations for Egypt’s first monorail
INFRASTRUCTURE

Casagrande's part in Egypt's first monorail

Casagrande has supplied the rigs working on the foundations of Egypt's first monorail

27 October 2021

 In addition to two Bauer BG 28 drilling rigs, two trench cutters together with mixing plants are also being used
INFRASTRUCTURE

Bauer's work on Egyptian port expansion

Local Bauer subsidiary contracted to construct diaphragm walls at Egyptian port expansion

07 July 2021

 Fugro’s team on a site visit during the Aswan Dam Bridge geotechnical investigation
CORE SAMPLING

Fugro completes soil investigation for new Aswan Dam bridge

Granite proves no problem to Fugro when drilling for samples for a site investigation in Egypt

21 April 2020

 Fugro’s Cairo Monorail site investigation team gathers for a daily briefing from the site manager and QHSSE representative before starting drilling activities
SITE INVESTIGATION

Fugro awarded Cairo Monorail megaproject site characterisation contract

Fugro's ground investigation work for Egyptian monorail project

14 April 2020

 The Egyptian government has contracted Keller to design, supply, install and test a second phase of prefabricated vertical drains at East Port Said Industrial Zone
INFRASTRUCTURE

Keller back at industrial zone for PVD project

Previous success leads to Keller returning to East Port Said Industrial Zone project in Egypt

11 December 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.