HS2: 4 of 9

 More than 50 concrete piles will form the foundations of a new viaduct which will form part of the UK’s HS2 high-speed rail line
INFRASTRUCTURE

Foundation work begins on HS2's carbon-saving Wendover Dean Viaduct

Drilling is playing a significant role in the 'green' construction of a high-speed rail viaduct

08 July 2022

The new Bauer eBG33 piling rig cuts 1,200kg of CO2 per day and reduces noise by 50%
PILING

HS2 trials 'first of a kind' electric drill rig

A Bauer Maschinen electric drill rig is being trialled as part of switch to zero-carbon construction

13 June 2022

 Major green milestone for HS2 as project announces first diesel-free construction site: HS2 minister Andrew Stephenson and SCS electric crane operator Leon Sobers
INFRASTRUCTURE

Major green milestone for HS2 as project announces first diesel-free

One of HS2's construction sites has become diesel free as project looks to reduce emissions

17 May 2022

 Methodologies used by Sheet Piling UK to suit the environment and geology on the HS2 with which it has worked, have included pre-auguring pile lines and water jetting
INFRASTRUCTURE

Sheet Piling UK and HS2

Examining how Sheet Piling UK has brought a proactive approach to its work on the HS2 project

10 May 2022

 School students have named the latest TBM to be used on the UK's HS2 high-speed rail project
INFRASTRUCTURE

Latest HS2 mini-TBM named by local students

School students have named the latest TBM to be used on the UK's HS2 high-speed rail project

06 May 2022

 Pupils from Old Oak Primary School visit new hoardings they designed at Wormwood Scrubs
INFRASTRUCTURE

Primary School pupils name mini HS2 tunnel boring machine 'Bramble'

School pupils visit HS2 site before choosing a name for a tunnel boring machine

20 April 2022

 HS2 tunnelling machines have reach the Chalfont St Peter ventilation shaft 3.6 miles into their journey
INFRASTRUCTURE

HS2 tunnelling machines reach Chalfont St Peter ventilation shaft

HS2 tunnelling machines have reached the Chalfont St Peter ventilation shaft

15 March 2022

 Casagrande has supplied two of its compact C5R XP-2 drill rigs for use in tunnels on the UK’s HS2 high-speed rail network project
INFRASTRUCTURE

Casagrande C5R XP-2 drill rigs utilised on HS2 project

Casagrande's compact C5R XP-2 drill rigs are being deployed in HS2 tunnels

16 February 2022

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.