infrastructure

Excavation of the station box at HS2’s Old Oak Common site has now been completed. Credit: HS2
INFRASTRUCTURE

HS2's Old Oak Common station box excavation complete

After three years, HS2 has completed the excavation of the Old Oak Common station underground box

15 July 2024

Dewatering pumps supplied by Atlas Copco are being used to allow the construction of a new bridge connecting the cities of Dipolog and Dapitan in the Philippines. Credit: Atlas Copco
INFRASTRUCTURE

Dewatering an infrastructure project

Critical dewatering operations delivered with Atlas Copco pumps in the Philippines

04 July 2024

 TBM ‘Celia’ breaking through at HS2’s tunnel under the Chiltern Hills completing a 10-mile journey that began in June 2021
INFRASTRUCTURE

Final breakthrough for HS2's longest tunnel

The second TBM building HS2, the UK’s new high-speed rail link, under the Chiltern Hills has now broken

25 March 2024

 All Bauer Technologies equipment deployed on-site at the York Central project will use hydro-treated vegetable oil, significantly reducing the project’s carbon footprint
PILING

Bauer Technologies wins major geotechnical project at York Central

Green technology comes to the fore as Bauer Technologies takes on rail infrastructure project

22 March 2024

 The new Herrenknecht Double Shield for the Brenner Base Tunnel has a diameter of 10,370mm, a length of around 183m and weighs a total of around 2700t
INFRASTRUCTURE

Seventh TBM handed over for the record-breaking Brenner project

First of two Double Shield TBM for construction BBT project presented by Herrenknecht

20 March 2024

 The German aggregate industry is reaping the benefits of increasing numbers of construction projects in Germany
GROUNDWATER

Germany ready for drilling acceleration

Eugene Gerden reports that the geotechnical drilling sector in Germany is returning to growth

20 March 2024

 Tereratec’s TBM, the largest double shield machine in the Indian Himalayan Region, is presently working for Hindustan Construction Co. Ltd. of India
INFRASTRUCTURE

Indian hydropower project uses Terratec TBM with continuous conveyor

Continuously advancing conveyor is part of TBM built for Indian hydropower project

13 March 2024

 The breakthrough of TBM “Houda” having completed the bore for the tunnels of Lot 2 of the Line 16 of the new metro line of the Île-de-France
INFRASTRUCTURE

Webuild finishes excavation on Lot 2 of Line 16 of Grand Paris Express

Second Webuild TBM finishes bore for Paris Metro extension project

12 March 2024

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.