piling: 11 of 52

 Piling to support HS2’s Colne Valley Viaduct has recently been completed
PILING

HS2 completes foundation work for UK's longest railway bridge

Piling has been completed for UK's longest railway bridge as a part of the HS2 rail project

02 February 2023

 The MLT60 maintained load test system, which is UK’s highest capacity pile load test system capable of testing loads up to 60MN, has been introduced by Cementation Skanska.
PILING

Cementation Skanska unveils unique pile testing capability

Largest capacity pile load test system in the UK introduced by Cementation Skanska

31 January 2023

 The joint venture of Bauer Technologies and Keller UK has been awarded the piling contract for the construction of a new £300 million wind turbine monopile manufacturing facility in Teesside
PILING

Bauer Keller JV secures piling works for monopile manufacturing facility

UK ground engineering specialists form JV for work on wind farm monopile factory site

25 January 2023

 Specially designed Bauer Dive Drills are working in water depths of up to 40m and simultaneously drill holes up to 47m deep and 3m in diameter
PILING

Challenging offshore conditions are overcome by Bauer Spezialtiefbau piling team

Numerous challenges have been overcome by Bauer Spezialtiefbau during offshore piling work

23 January 2023

 Can adherence to BES 6001 certification help the piling sector to achieve sustainability?
PILING

Sustainability in the piling sector

What is BES 6001 certification and why should the piling industry aspire to achieve it?

16 January 2023

 US manufacturer of geotechnical and structural instrumentation, Geokon, is now employee-owned
SITE INVESTIGATION

Geokon becomes 100% employee-owned through an ESOP

US manufacturer of geotechnical and structural instrumentation, Geokon, becomes employee-owned

11 January 2023

 Junttan Oy has acquired its UK distributor
PILING

Junttan Oy has acquired Junttan UK

Junttan Oy strengthens UK presence with the acquisition of local distributor

09 January 2023

 Oxagon, with its strategic location close to the Suez Canal, will be a part of the NEOM development in Saudi Arabia
PILING

Bauer Group receives follow-up orders for the mega-project NEOM in Saudi Arabia

Further contracts have been awarded to Bauer as part of THE LINE mega project in Saudi Arabia

04 January 2023

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.