Sicily

 Close to the city of Nicosia, Sicily, two Bauer rigs are performing columns in single column mixing method to improve the present soil conditions
PILING

BAUER rigs at work in Sicily for a big SCM project

Single-column mixing method is being used by Bauer to create new road foundations in Sicily

10 April 2023

 Fugro’s surveys will help Terna design the most cost-efficient and feasible route for the East Link of their 480km HVDC submarine cables in southern Italy and the Tyrrhenian Sea (cable route shown as red line)
SITE INVESTIGATION

Fugro to survey for Italy's Tyrrhenian Link power cable project

Italy's national grid owner contracts Fugro for undersea cable survey

05 April 2021

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.