News: 3 of 516

Comisión Federal de Electricidad’s Cerro Prieto geothermal power plant in Mexico generates 570Mwe Credit: Comisión Federal de Electricidad
GEOTHERMAL

Under the surface of Latin America

Latin America has geothermal potential that could result in investments of $1.3 billion in 2027

12 April 2024

In March, UVM drilled a test well on the Athletic campus to measure the potential for tapping into geothermal energy Credit: UVM
GEOTHERMAL

UVM explores geothermal for campus buildings

University of Vermont explores geothermal options as part of "Comprehensive Sustainability Plan"

11 April 2024

Sinopec Completes Drilling of China’s Deepest Geothermal Exploration Well of 5200m Credit: Sinopec
GEOTHERMAL

Sinopec drills 2500m geothermal exploration well in China

Sinopec has successfully completed the drilling of China’s deepest geothermal exploration well

11 April 2024

The cutterhead of TBM Anne from the Victoria Road Crossover Box Credit: HS2
INFRASTRUCTURE

HS2 launches fourth TBM under London

New tunnelling machine joins three others digging high-speed line under London

10 April 2024

 The honeycomb method is being used for a soil remediation project in Velten, Germany Credit Bauer Group
GROUND CONTROL

Soil replacement using the honeycomb method

A high-frequency vibrator is inserting honeycomb structure as part of a soil remediation project

10 April 2024

Causeway Geotech has expanded its drilling fleet with the addition of a fourth roto-sonic rig - a Eijkelkamp Fraste CRS XL140 Duo Royal Edition Credit: Causeway Geotech
SITE INVESTIGATION

Causeway Geotech expands fleet of sonic rigs

A fourth Eijkelkamp Fraste sonic rig has been added to the Causeway Geotech fleet of drills

09 April 2024

Underground hydrogen storage options are to be researched in Finland Credit: VTT
UTILITIES

Finish project into underground hydrogen storage initiated

VTT, GTK and industrial partners initiate groundbreaking research project on hydrogen storage

09 April 2024

One of the launch and reception shafts constructed by Barhale to allow an Akkermann TBM to be deployed to drive a 120m long tunnel beneath the Grand Union Canal in London Credit: Barhale
INFRASTRUCTURE

UK Power Networks and Barhale build tunnel to power HS2 construction to Euston

Micro-tunnel under the Grand Union Canal in West London to support HS2 main tunnelling completed

09 April 2024

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.