piling: 13 of 52

 Teams from Sheet Piling (UK) have returned to a site that they first worked at in spring 2021
PILING

Sheet Piling UK returns to Old Oak Common for further piling work

Second piling job requirement sees Sheet Piling (UK) return to HS2's Old Oak Common site

30 November 2022

 (left to right) Peter Palicz (Hitachi Zosen Inova) Michael Smeaton (Hitachi Zosen Inova) Pierre-Jean Matherat (Hitachi Zosen Inova), Nicholas Rogers (Bauer Technologies), Michael Jones (Bauer Technologies), Duma Kumalo (Hitachi Zosen Inova) and Luke Scargall (Hitachi Zosen Inova)
PILING

Bauer Technologies awarded piling contract for Rivenhall IWMF

New UK integrated waste management facility will be built on Bauer Technologies piling work

28 November 2022

 DEME has secured contracts representing 1GW for Hai Long wind farms in Taiwan
PILING

DEME secures contracts representing 1GW for Hai Long wind farms in Taiwan

Taiwanese wind farm project will see DEME install 73 wind turbines

18 November 2022

 Red7Marine is currently completing work on site in Lowestoft for the £2 million design and build project for a new river wall in front of Sladdens Pier for Associated British Ports
PILING

Red7Marine completes £2 million pier contract

Multiple barges used by Red7Marine on UK port upgrade piling project

16 November 2022

 Keller Geoteknikk has acquired Nordwest Fundamentering AS
PILING

New acquisition for Keller in Norway

Keller subsidiary grows with the addition of a Norwegian specialist geotechnical contractor

16 November 2022

 The new eGEO 405, a fully electric soil investigation machine, was developed by Comacchio in  with its UK distributor of geotechnical rigs JKS Boyles
SITE INVESTIGATION

Comacchio reveals electric rig option during bauma

Multiple new rigs debuted at bauma by Comacchio including battery-electric option

14 November 2022

 Network Rail has begun piling work to replace overhead line equipment previously in place on the Midland Main Line route
INFRASTRUCTURE

Piling work begins for electrification of UK Midland Main Line railway

Electrification of main UK railway line begins as piling work gets underway

11 November 2022

 A UK project being undertaken Bauer Technologies algins with the company’s sustainability goals following its BES 6001 sustainability accreditation
PILING

Bauer Technologies sustainable piling first

A piling project in Manchester is a first in sustainability for Bauer Technologies

09 November 2022

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.